1-Contracts for construction of Sewage Treatment Plants need to be on time and built with no extras in contracts. 2-Contractor payment schedule after Engineer's inspection should be rapid. 3-Reduce number of projects started so there is no Sewage Treatment Plants built with out electric transmission lines and sub-stations built. These plants should have generators with auto transfer switch gear in case operator is not there at 3:00 a.m. in morning. 4-Floating Sewage Treatment Plant Operator Trainers to be at plants before, during and after plant is put into operation. Then move to other plants and do same. 5-Success is when the Sewage Treatment Operator Trainer trains Trainers. They are called Trainer of Trainers.
Published by Robert McColgan, int'l Training Water & Wastewater Operation
1-Contracts for construction of Sewage Treatment Plants need to be on time and built with no extras in contracts. 2-Contractor payment schedule after Engineer's inspection should be rapid. 3-Reduce number of projects started so there is no Sewage Treatment Plants built with out electric transmission lines and sub-stations built. These plants should have generators with auto transfer switch gear in case operator is not there at 3:00 a.m. in morning. 4-Floating Sewage Treatment Plant Operator Trainers to be at plants before, during and after plant is put into operation. Then move to other plants and do same. 5-Success is when the Sewage Treatment Operator Trainer trains Trainers. They are called Trainer of Trainers.