1. Ideally at the tail- end of each STP have large constructed wetland for doing phyto remediation of effluent.. with 1 day HRT. 2. Both the re use water and sludges are evolved to be re used at site itself . 3. Slot in greens and plant foliage to give aesthtics and floral design . 4. Plan Control Room to have IAQ Plants Well wishes Prof Ajit Seshadri. INDIA ...
Published by Ajit Seshadri Seshadri, Er.
1. Ideally at the tail- end of each STP have large constructed wetland for doing phyto remediation of effluent.. with 1 day HRT.
2. Both the re use water and sludges are evolved to be re used at site itself .
3. Slot in greens and plant foliage to give aesthtics and floral design .
4. Plan Control Room to have IAQ Plants
Well wishes
Prof Ajit Seshadri.
INDIA ...