1. Ideally at the tail- end of each STP have large constructed wetland for doing phyto remediation of effluent.. with 1 day HRT. 2. Both the re use water and sludges are evolved to be re used at site itself .  3. Slot in greens and plant foliage to give aesthtics and floral design . 4. Plan Control Room to have IAQ Plants  Well wishes Prof Ajit Seshadri. INDIA ...

Published by

1. Ideally at the tail- end of each STP have large constructed wetland for doing phyto remediation of effluent.. with 1 day HRT.

2. Both the re use water and sludges are evolved to be re used at site itself . 

3. Slot in greens and plant foliage to give aesthtics and floral design .

4. Plan Control Room to have IAQ Plants 

Well wishes

Prof Ajit Seshadri.

INDIA ...