It is a fit case for booking the state and ULB for such gross negligence and criminal action, It also calls for putting the untreated sewage thru Tube Mill to arrest the muck and at least release clear water into the river system until STP can be constructed.
Published by LOKESH PUNJ, A B.TECH. Agr Engg, PGDM-SPA IIMA (1977-9) 25 yrs in Water Piping / Irrigation/Infra Projects
1 Comment
What do you think PTS will do better? Since the principle of wastewater management remains virtually the same everywhere in the world: natural hydraulic water surfaces serve as waste bins for wastewater.
The STP will decant, filter and discharge the liquid into the gangway. What will become of the filtration residues? Nothing will be dumped after a while in the gangway. Or they will be incinerated creating air pollution. Or they will be dispersed in agricultural soil despite all the chemical pollution, dissolved in the liquid. And what becomes of the urine which in contact transforms its urea into ammonia making the liquid very toxic?
Billions of dollars will be invested in STP infrastructure for nothing. Reassure yourself it's the same in all countries